Y’all Didn’t Read Instructions…

Grades are done. A miracle in itself. It felt never-ending. I mean, I say they’re done, but that’s just Trimester 1. I have four more iterations of panicking over grades. This school year. I actually already have stuff to be graded for Trimester 2…oh yay! A project is finishing up today and tomorrow, with a packet and roller coaster to be graded. 34 roller coasters, as quickly as possible, before the tape starts to fail and they don’t work. I’d do it today, but I have to ship a quilt. Tomorrow after school is pilates and Wednesday is a union meeting. Thursday? I don’t know. I still need sub plans for Wednesday morning’s literacy meeting. Not sure when I’m doing those, let alone making sure I have everything copied for next week (I don’t. None of it.),

I get frustrated with kids who continually resubmit their work without actually reading instructions or comments. I have two who tried to resubmit over the weekend (gradebook closed 10/27 y’all) but no. Y’all didn’t read instructions. You didn’t follow them. You didn’t read or follow comments. I’m done. I’m out. I cannot grade 24 hours a day.

I did get some other things done this weekend: I fixed the damn showerhead so there’s actual water coming out of it. Plus! That was a kamikaze trip to Home Depot. I also got the boychild and the ex to buy me lattice (it won’t fit in my car; I needed a truck) so I can replace what’s on the deck posts and maybe plant some things that will grow up it. I need dad’s help with that. I planted out a bunch of succulents that had been (unhappily) living on the kitchen counter. I have two more that need to go out there, but I went to my quilt guild meeting, which was nice…got to see everyone’s scrap block challenge pieces, the one I never got to. I know…I never do. Well, except during COVID.

And I quilted…Friday night…in the swamp.

Saturday night, I worked on pedestals…

Last night, I finished the pedestals, did the goddess’ legs up to the pubic area, and got most of the people under the umbrella done.

I have two people left to do. The machine is being a little fussy. Not sure how to make it stop. Probably needs cleaning. Next time I refill the bobbin thread, I’ll do that. See if it helps. Also, when I finish, I probably need to call the machine guy and put it on the list to be serviced. I think it’s been a year. They used to put a sticker on it so I would know. Not finding it. Doesn’t mean a cat didn’t eat it.

Probably not this one…

Nova has been clawing my ass in the work chair out in the living room, or making air biscuits here on the couch. But not in my office/studio.

We went hiking on Saturday…

It’s getting dark so early. Ugh. Even earlier tonight.

The next month is a little lighter on the weekend events. Plus some days off from work, which will be much appreciated. I’ll still need to grade and plan, but not while I’m working in the classroom. After today, I can put all the roller coaster materials away and we can move on to the next stuff. After I find all the magnets. I know they’re somewhere. Probably multiple somewheres.

She is cute.

So I’ll be quilting all week, probably. I tried to buy binding on Saturday on the way back from my guild meeting, but I didn’t find anything obvious that would work. I’m going to have to wait until I’m done (or near done) quilting and take the whole quilt in. Friday or Saturday. The quilt store isn’t open late enough during the week. I do have Friday off, so hallelujah. Today is finish building roller coasters, get packets in order, ready to turn in, babysit some kids who didn’t go on the other team’s field trip, a staff meeting, then drive to the UPS place that is actually open after 2 PM to ship this quilt. I have to cook tonight, plus plan some more or something for school. Then quilt. Blessed quilt.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.